








- 01
Ntufu eletrọnịkị (akara ikuku refrigerator).
- 02
Nkewa nke mkpọ aluminom na ọla ferrous.
- 03
Kewapụ aluminom ma ọ bụ ngọngọ ọla kọpa site na ngalaba nke ụgbọ ala agbahapụla.
- 04
Kewapụ ọla ndị na-abụghị ígwè na ihe mkpofu iko.
- 05
Kewapụ adịghị ọcha ígwè na-abụghị ígwè na ụfọdụ ahịrị mmepụta (dị ka ahịrị mmepụta ihe eji emegharị plastik).
- 06
Kewapụ ọla ndị na-abụghị ígwè na osisi.

1.Easy to operate and install
2.Obere ike oriri
3.Separate ferrous na non-ferrous metal na-akpaghị aka
4.Good nhazi mmetụta, na ihe nwere obere nha nwere ike ịhazi.
5.Concentric rotor nwere nnukwu ebe nkewa na ike nkewa siri ike.
6.A ụdị dị iche iche, ụdị dị iche iche maka ndị ahịa ịhọrọ
7.Protective device to give warning when it is in a dangerous condition

Nkewa nke Eddy ugbu a dabere na iji rotor magnetik nwere polarity ọzọ, na-agba ọsọ ọsọ n'ime drọ na-abụghị ọla nke eriri ebu na-ebugharị. Ka ọla ndị na-abụghị igwe na-agafe n'okirikiri ahụ, oghere ndọta na-agbanwe agbanwe na-eme ka mmiri dị n'ime akụkụ igwe anaghị emepụta ihe na-eme ka ihe ahụ pụọ na ebufe. Mgbe ihe ndị ọzọ na-adapụ na njedebe nke ebufe, ọla ndị na-abụghị ígwè na-ebuga n'ihu n'elu nkewa maka nkewa.

Nlereanya |
Width of Belt (mm) |
Ike (kw) |
Ike (m3/h) |
N'elu niile size L*W*H (mm) |
Ibu (kg) |
ECS 600 |
600 |
10.5 |
3-5 |
3300*1500*1200 |
1000 |
ECS1000 |
1000 |
13.7 |
5-8 |
3300*1900*1500 |
1500 |
ECS1200 |
1200 |
19.95 |
8-10 |
3300*2100*1700 |
2000 |
ECS2000 |
2000 |
20.49 |
10-15 |
5100*2650*2000 |
2500 |
Akụkọ metụtara
-
Troubleshooting Common Eddy Separator Problems
In the realm of recycling and material separation, eddy current separator, eddy separator, and eddy current sorting machine play a vital role in efficiently separating non - ferrous metals from various waste streams.
GỤKWUO -
The Role of Metal Recycling Plants in Circular Economy
In the pursuit of sustainable development, the circular economy has emerged as a crucial concept.
GỤKWUO -
The Impact of Recycling Line Pickers on Waste Management Costs
In the intricate landscape of waste management, every component plays a crucial role in determining operational costs.
GỤKWUO